Actual construction of three power plants in Anhui Pingwei 1000MW unit (water treatment, ash slag part), through careful construction, scientific management, on April 13, 2015 to reach trial operation conditions, the 1st boiler has been successfully ignited.
CopyRight © 2021 All Rights Reserved Copyright Jiangsu CTP Power CO.,LTD
技术支持:三赢网络